TRT-909 Track Renewal System

TRT-909 Track Renewal System

Harsco Rail’s TRT-909 track renewal system provides a more efficient and effective way to handle major track renewal programs. The TRT-909 works with concrete, pre-plated wood, or steel ties. It delivers simplicity in operation for customers and leaves behind high quality track with precise tie spacing and a smooth ballast bed.

Performance:

  • Replaces both rails simultaneously
  • Works with concrete, pre-plated wood, or steel ties
  • Removes and replaces crossties
  • Pulls and reclaims spikes
  • Removes and collects rail anchors
  • Removes the old rail and installs the new rail

Key Specifications:

Traveling Speed:
Towed - Up to 80 km/h (50 mph)
Length
90.2 m (296 ft.) without locomotive
Drive Train
525 hp diesel driving variable-flow hydraulic pumps for hydrostatic advance of the machine
Traction During Operation
6 powered bogies
Ballast Regulation
Working—144 m (12 degrees) (478 ft.); Traveling—97.5 m (18 degrees) (320 ft.)
Engineer to Order
Machines are designed to meet the customer’s specifications